In addition to theValve Test dialog, the progress of a test can be observed in theMonitor Status
view.
Figure 41 Valve Test Progress
4.12. Recording Automated Tests and External Events
The Valve Manager continuously monitors all valves in all projects for their current status and activity.
Applications following the guidelines on automated testing can initiate a valve test outside of the Valve
Manager, but still have the Valve Manager collect the test results, apply any additional threshold
pass/fail criteria, and save the resulting information in the project’s database.
Working in conjunction with the VTEST function block, the Valve Manager will also collect transition
time information when the valve itself is commanded to change state. There is a slight delay (32
seconds) after the commanded change of state before this data becomes available. The Valve
Manager will mark the data collected in this manner asExternal, meaning that it was generated
outside of a test, but will still apply any threshold pass/fail criteria.
4.13. Clearing Valve Test History
The historical test results for a valve can be removed from the projects database. Select the valve
whose history you want to remove in theProject Tree, then selectValve | Clear Valve Test History
from the main menu. The Valve Manager will display a dialog box asking for confirmation.
Figure 42 Clear Valve Test History
Selecting “Yes” will remove all test results for the selected valve. The valve’s profile information will not
be removed.