Manual
Table Of Contents
- 1. Description
- 2. System Requirements
- 3. OPC Requirements
- 4. Valve Manager Application
- 4.1. Installation
- 4.2. Running the Valve Manager application
- 4.3. Creating a Data Source
- 4.4. Creating a Project
- 4.5. Working with Multiple Projects
- 4.6. Editing a Project
- 4.7. Removing a Project
- 4.8. Adding, Removing, and Renaming Valves
- 4.9. Configuring a Valve Profile
- 4.10. Applying the Same Profile to Multiple Valves
- 4.11. Initiating a Test
- 4.12. Recording Automated Tests and External Events
- 4.13. Clearing Valve Test History
- 4.14. Controlling the Monitor
- 4.15. Project Tree
- 4.16. Main Window

Trusted
TM
Valve Manager T8031
Issue 2 Oct 05 PD-T8031 27
When the “OK” button is clicked, the Valve Manager will create an empty database and register it as an
ODBC data source. A confirmation dialog will then be displayed.
Figure 22 Database Creation
4.4. Creating a Project
The Valve Manager is configured to work with a particular Trusted
TM
system by defining a “Project”. A
project is created by selecting “Project | New Project” from the main menu.
Figure 23 Project Creation