Instruction Manual
Hardware Installation/Maintenance
3-1
Site Selection Considerations 3
Access Considerations 3
T6200 Unit Automating System Mounting 4
T6200 Controller Electrical Power Wiring 6
T6200R Subrack Electrical Power Connection 8
Input/Output Hardware Configuration 9
Signal Wiring 10
Wiring and Jumper Placement for T6200-C Channels 1-8 12
Wiring and Jumper Placement for T6200-C Channels 9-16 13
Wiring and Jumper Placement for T6200-C Channels 17-22, 31, and 32 14
Wiring and Jumper Placement for T6200-C Channels 23-26 16
Wiring for T6200-C Channels 27-30 17
Wiring and Jumper Placement for T6200-D Channels 1-26, 31, and 32 17
Wiring for T6200-D Channels 27-30 19
Ethernet Communication Network 19
Network Security 19
Ethernet Network Connectors 19
Network Cabling 20
Non-Redundant Network 20
Redundant Network 21
T6200R Subrack Ethernet 23
Operator Interface Installation 24
Firmware Changes 27
Serial Communication Connection 28
3
Section Three
Hardware Installation/Maintenance