Owner manual

RSNetWorx Configuration for PLC-5C Applications
5-17
Step 13. Repeat steps 9-12 for additional nodes. When complete,
all of the nodes should be mapped (figure 5.23).
Step 14. Click
F
ile
/
Save
to save the project (figure 5.24). If
prompted to optimize and re-write schedule for all
connections, click
O
K.
Figure 5.23 ScanList Configuration: Mapped Nodes
Figure 5.24 Save Configuration Dialog Box
SP600
SP600