User manual

1 Publication 1760-UM001A-EN-P
Chapter
2
Installation
Pico is installed in the following order:
Mounting
Using surge suppressors
Wiring the inputs
Wiring the outputs
Connecting the incoming power
Prevent Electrical
Shock
European Communities
(EC) Directive
Compliance
If this product has the CE mark it is approved for installation within the European
Union and EEA regions. It has been designed and tested to meet the following
directives.
EMC Directive
This product is tested to meet the Council Directive 89/336/EC Electromagnetic
Compatibility (EMC) by applying the following standards, in whole or in part,
documented in a technical construction file:
EN 50081-1 EMC — Generic Emission Standard, Part 1 — Residential,
Commercial, and Light Industry
EN 50082-2 EMC — Generic Immunity Standard, Part 2 — Industrial
Environment
This product is intended for use in an industrial environment.
Low Voltage Directive
This product is tested to meet Council Directive 73/23/EEC Low Voltage, by
applying the safety requirements of EN 50178 Electric Equipment for Power
Installations Equipment Requirements and Tests. For specific information required
ATTENTION
!
!!
!
Follow these guidelines when you handle the controller:
Remove power before working on any of the wiring to Pico.
Touch a grounded object to discharge static potential.
Wear an approved wrist-strap grounding device.
If available, use a static-safe work station.