User guide

Rockwell Automation Publication 1560E-UM051F-EN-P - June 2013 57
Chapter 3
Commissioning Procedure
Preliminary Setup
A. Ensure the work area is clean and tidy. Pathways to main disconnect and
emergency stop push button must be clear and unobstructed.
B. The following test equipment is to be prepared for use:
Test power supply, supplied with each controller
Multimeters
Hi-Pot Tester (recommended) or Megger
Oscilloscope with memory (optional)
C. Complete drawing package and parts list.
D. Specification of project.