User guide

Rockwell Automation Publication 1560E-UM051F-EN-P - June 2013 131
Troubleshooting Chapter 9
Figure 56 - Removal of SCR 2 and SCR 4 (3300 to 4160V, 180/360A)
To Remove SCR 4:
Remove shorting bar hardware
Pry Heatsinks 4 and 5 apart
•Extract SCR
To Insert New SCR:
Apply thin film of electrical joint compound to surfaces of SCR
Install SCR so that it is seated in locating pin of heatsink (note
orientation of SCR).
Pry heatsinks to close gap, ensuring that SCR is seated properly in
both its locating pins.
Rotate SCR so that all leads have same direction.
Proceed to replace SCRs matched pair (SCR 2).
Note: You must replace both SCRs of a matched set.
SCR 4
SCR 2
Shoring Bar Hardware
Heatsink 2
Heatsink 5
Locating Pin
Shoring Bar
Hardware