Manual
Field Supply Kit for Regenerative MinPak Plus DC Drives
3
Step 8. Verify that the wiring of the Field Supply is correct and all connectors are securely fastened.
Step 9. Reattach the cover to the drive.
Step 10. Apply power and test the operation of the drive.
This completes installation of the Field Supply kit.
Figure 1 – Connecting the Field Supply (Full-wave)
Figure 2 – Connecting the Field Supply (Half-wave)
F1
F2
To F1, F2 on motor
AC
AC
+
–
3TB
2TB
51 52
F2
To F2 on motor
AC
AC
+
–
3TB
2TB
51
52
To F1 on motor