Owner's manual
11 Publication LZ-UM001A-EN-P - January 2008
Chapter
2
Installation
Introduction
Use the following section to guide you through installation and start-up of
your LZ linear motor.
Unpacking and Inspection
Inspect motor assemblies for damage that may have occurred in shipment.
Any damage or suspected damage should be immediately documented. Claims
for damage due to shipment are usually made against the transportation
company. Contact Anorad immediately for further advise.
• Compare the purchase order with the packing slip.
• Check the quantity of magnet channels received matches your job
requirements.
• Identify the options that came with your linear motor.
• Inspect the assemblies and confirm the presence of specified options.
Topic Page
Unpacking and Inspection 12
Installing the Linear Motor 12
Motor Power and Feedback Cable Signal Names 15
Motor-Hall Phasing and Sequence 17
Positive Motor Direction 18
Motor Coil Thermal Protection 19
Operational Guidelines 20
ATTENTION
Linear motors contain powerful permanent magnets which
require extreme caution during handling. When handing
multiple magnet channels do not allow the channels to come in
contact with each other. Do not disassemble the magnet
channels. The forces between channels are very powerful and
can cause bodily injury. Persons with pacemakers or Automatic
Implantable Cardioverter Defibrillator (AICD) should maintain a
minimum distance of 0.33 m (1 ft) from magnet assemblies.
Additionally, unless absolutely unavoidable, a minimum
distance of 1.5 m (5 ft) feet must be maintained between
magnet assemblies and other magnetic or ferrous composite
materials. Use only non-metallic instrumentation when
verifying assembly dimension prior to installation