t Owner manual
Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014 405
Time of Day Control Chapter 13
System Commissioning
To commission the system, you need to install the system hardware and download the projects.
Install System Hardware
Refer to the documentation listed below for information on installing the CompactLogix and PanelView Plus Hardware.
Download RSLogix5000 Project File
Follow these steps to download your RSLogix 5000 project file to the Logix controller.
1. Open your RSLogix 5000 project file.
2. From the Communications menu, choose Who Active.
The Who Active dialog box opens.
Document Name Publication Number Document Contents
CompactLogix Packaged Controller Installation
Instructions
1769-IN082
• Installation Checklist
• Controller Dimensions
• How to Install the Battery
• How to Connect Expansion Modules
• Minimum Spacing Requirements
• How to Panel Mount
• How to DIN Rail Mount
• Grounding Considerations
• Wiring Power to the System
• Wire the I/O Removable Terminal Blocks
• Expansion Module Wiring
• Selecting Operating Mode
• Status Indicators
PanelView Plus Installation Manual 2711P-IN002 • Environmental Information
• Mounting Clearances
• Cutout Dimensions
• Panel Mounting Instructions
• Product Dimensions
• Removing and Installing the Power Terminal
Block
• DC Power Connections
• AC Power Connections
• Troubleshooting
• Battery Removal
• System Specifications
• Certifications