t Owner manual
214 Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014
Chapter 11 FactoryTalk View ME Energy Faceplates
Before You Begin
• Determine business goals, complete energy assessment, and determine monitoring methods (Chapter 1).
• Select hardware and wire devices (Chapter
2).
• Configure data collection devices (Chapter
3).
• Complete FactoryTalk EnergyMetrix software chapters (Chapter
5 through (Chapter 9).
• FactoryTalk View Machine Edition software loaded on your personal computer.
What You Need
• RSLogix 5000 software, version 17 or later or Studio 5000 Logix Designer application, version 21.00 or later
• FactoryTalk View Machine Edition software, version 5.0 or later
• Energy Management Accelerator Toolkit, publication IASIMP-SP014
or visit the Integrated Architecture Tools and Resources website at http://www.ab.com/go/iatools
• Hardware installation and wiring complete with power applied
• FactoryTalk View ME runtime application file downloaded to the PanelView Plus terminal