t Owner manual

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014 149
FactoryTalk EnergyMetrix Software Meter and Tag Setup Chapter 7
The tag just entered should
appear on the Meter Setup
tab.
For this example, you should
see these tags.
14. Click the Meter Data tab to verify that the meter data
is being logged.
The data will not appear until the next logging
interval has occurred.
Another way to check the data is to return to the
Meter Setup tab and click the Read device tags
link
just above the list of meter tags.
You can click Current Date/Time to refresh the data.
15. Repeat steps 1…14 to assign other energy meter tags to L2x analog or digital inputs.
Refer to the Energy Data Worksheet for the appropriate meter tag names.
For this Efficient Industries Plant 1
example, you will assign meter tags to the Fuel Oil, Propane, and Steam Flow
meters by using the information in the table.
Meter Name Meter Tag Name Value Type Address Tag Format Roller value
Fuel Oil Meter Fuel Oil Usage Fuel Oil Usage F10:1 32-bit Floating Point 10,000,000
Propane Meter Propane Usage Propane Usage F10:2 32-bit Floating Point 10,000,000
Steam Flow Meter Steam Usage Steam Usage F10:3 32-bit Floating Point 10,000,000