t Owner manual

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014 141
FactoryTalk EnergyMetrix Software Meter and Tag Setup Chapter 7
10. Confirm the meter was created in the correct
group.
11. Repeat steps 1…10 to create the rest of the energy meters that are assigned to PowerMonitor status inputs.
For this example, enter the data in the table for the Air Flow and Water Main meters. Make sure to create each meter
under the correct parent group.
For the Efficient Industries Plant 1
example,
the meter listing should look like this.
Meter Parent Group Meter Type Device Name
Air Flow Air Air Production 2 Air Flow Meter
Water Main Water Water MCC 2 Water Main Meter