108 Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014
Chapter 5 FactoryTalk EnergyMetrix Groups and Security Setup
Efficient Industries Plant 1
Engineering (Subdomain)
EFFICIENT INDUSTRIES PLANT 1
(Parent Domain)
Electric Main (PM 3000)
Boiler House (PM 1000)
Production 1 (PM 1000)
Production 2 (PM 1000)
Shipping/Receiving/DC (PM 1000)
Electricity (Group)
Gas Main (MCC 2 PM 1000 Status Input 1)
Boiler House Gas (L2x Digital Input)
Fuel Oil (L2x Analog Input)
Propane (L2x Analog Input)
Fuels (Group)
Steam (Group)
Steam Flow (L2x Analog Input)
Air (Group)
Air Flow (Production 2 - PM 1000 Status Input 1)
Water (Group)
Water Main (MCC 2 PM 1000 Status Input 2)
Accounting (Subdomain)
Data Center (OPC Server)
Data Center (Subdomain)
Production 2 (Subdomain)
Production 2 (PM 1000)
Boiler House (PM 1000)
Power House (PM 1000)
Gas Main (MCC 2 PM 1000 Status Input)
Water Main (MCC 2 PM 1000 Status Input)
Utilities (Subdomain)
Propane (L2x Input)
Fuel Oil (L2x Input)
Production 1 (PM 1000)
Production 1 (Subdomain)
Data Center (OPC Server)
Power House (PM 1000)
Shipping/Receiving (Subdomain)
Shipping/Receiving/DC (PM 1000)
Data Center (OPC Server)