INSTALLATION MANUAL Manual
Chapter 5
Installing the Peripherals
5-2
To connect a programming terminal to RM/KA module, follow these steps.
RM
Programming terminal
16773
To install the industrial disk, perform the following tasks:
set the operating voltage
set the address (for 5710-ID4, -ID5 only)
wire an out-of-temperature shutdown warning device (optional)
wire the industrial disk for ac power
connect the industrial disk to the MicroVAX Information Processors
connect the industrial disk to second industrial disk (optional)
connect a terminator on the last disk
Install the Industrial Disk