Installation Instructions Manual

8 MobileView Connection Cable
Publication 2727-IN004C-MU-P
Connecting the MobileView Terminal to the Junction Box
24V DC
ON LY
TER M INAL IN
R S422 OUT
ETHERNET OUT
+24V
GND
ES1+
ES1-
ES2+
ES2-
ED1+
ED1-
ED2+
ED2-
+24V
GND
ES1+
ES1-
ES2+
ES2-
ED1+
ED1-
ED2+
ED2-
7 8 9
4
5 6
1 2
3
.
0
-
ESC
KE TOP
Run
Er
r
o
r
Junction Box Cable
24 mm
25 mm ± 0.1
maximum wall
thickness 5mm (0.2 in)
X1/K3
X2/K4
0.98 in ± 0.0039
0.94 in
Pin 1, 24V dc
Opening for Jack
MobileView
Connection
Cable
Dust Cover
Use Grounding Screw
to connect Earth
Ground to the Junction
Box.
Junction Box
Cable Wire Tie
10 Base-T
Connection to
Ethernet Network
Junction Box
MobileView Terminal
Typical Control Cabinet
Pin 1, 24V dc
S1
S2
S3
MobileView Terminal
Connections
K1
Safety Equipment
Connections (For
MobileView G750 only)
2 m (6.5 ft)
Cable Clearance on Both Sides of Enclosure Wall
130 mm (5.12 in)
100 mm (3.94 in)
Junction Box
Cable
Connection
Cable
K1
Connection