Instruction Manual

PanelView 1200 Terminal Functions
Chapter 2
2-17
Choose No to tell the terminal to bypass the User EPROM/EEPROM test
at power-up. The following message will appear:
23627
WARNING: Choose Yes" if EPROM/EEPROMS are installed
Clear
F8
If you install a user PROM later, be sure to reset the power-up test to Yes.
PassThrough Download Options
The terminal Pass-Through Download Options allow you to configure the
pass-through address manually from the terminal. These options also let
you instruct the terminal to restart automatically after a successful
download or to wait for operator confirmation before running a new
application.
The pass-through download is retentive.
The following two illustrations shows the Pass-Through Download
Options screen for both touch screen and keypad terminals.
Choosing
Manual
Addr
ess Source
will disable the T
er
minal's
current application file.
Select Application
to enable.
23662
PASS-THROUGH
DOWNLOAD OPTIONS
>Auto Restart
>Address Source
>PLC Type
>BAUD Rate
>Rack Number
>Starting Module
>Rack Size
>Last Chassis
>Module Group
>High/Low Byte
Up
Cursor
Save &
Exit
ENT
DEL
78 9
45 6
12 3
0
CLR
Down
Cursor
Change
Data
Move the cursor upwards in the
selection list. If the cursor is at the
top, this menu choice will move it
to the bottom
Move the cursor downwards in the
selection list. If the cursor is at the bottom,
this menu choice will move it to the top
Move the cursor through the list of valid
options for the following items: Auto Restart,
Address Sources, PLC Type, Baud Rate,
Module Group and High/Low Byte
Save data and resolve incompatibility
problems before exiting
Yes
Manual
PLC5/250
230.4K
77
0
Full
Yes
7
High
Manual
Address
Source
Block
Transfer