User Manual
Rockwell Automation Publication 23P-IN005A-EN-P - June 2011 9
Step 7: Document
the Change
1. Record the installation of the new capacitor circuit board and date of installation
on the field installed option label on the side of the SAR (as shown below).
2. Replace the SAR covers in the reverse order of removal. See Remove the Covers
on page 3.
3. Install DPI cable (if present).