Reference Manual Owner's manual

124 Rockwell Automation Publication 750-RM001F-EN-P - February 2012
Chapter 10 Safety Configuration and Verification
Commissioning the System
The flowchart shows the steps required for commissioning a Speed Monitoring
safety system. The items in bold are explained in the following sections.
Specify the Safety Configuration
Project Verification Test
Configuration Signature ID Generated
Configure the System
Configuration Signature ID
Generated
Test s
Passed?
Yes
No
Confirm the Project
Record the Configuration
Signature ID
Lock the Configuration
Verify Signature ID and Lock Status
Make Required Modifications