Manual

18 PowerFlex® DC Drive - Frame B SCR Modules
Note the proper order of the washers when installing the bolts connecting
the bus bars to the SCR Modules and other bus bars.
For Regenerative drives, the longer leg of the intermediate AC input bus
bars connect to the top of the SCR Modules:
For Regenerative drives, five of the bolts are 24mm long and the rest are
20mm long. For non-regenerative drives, two of the bolts are 24 mm long
and the rest are 20 mm long. Install the 24mm bolts in the following
locations:
Bolt
Lock washer
Flat washer
Intermediate
bus bar
Phase U, V, or
W bus bar
SCR Module
on heatsink
Top of Drive
Long leg
Short leg
24mm bolt locations
Regenerative Drive Shown