Manual
Rockwell Automation Publication PFLEX-IN006E-EN-P - July 2013 155
Frame 14 Mechanical Installation Chapter 10
Figure 63 - Motor Wiring Example
IMPORTANT
Once power wiring has been completed, the protective covers must be
installed before energizing the drive. Installation is in reverse order of removal
(see Remove the Protective Covers from the Converter Unit(s) on page 142
and
Remove the Protective Covers from the Inverter Units on page 149
).
1U/T1 1V/T2 1W/T3 2U/T1 2V/T2 2W/T3PE
PE
Motor Frame
Motor
PE
PE
1L1 1L2 1L3 2L1 2L2 2L3
1U/T1 1V/T2 1W/T3 2U/T1 2V/T2 2W/T3
INU1 INU2
du/dt Filter 1 du/dt Filter 2
5 m
minimum