Owner's manual
10 Rockwell Automation Publication 20D-IN010B-EN-P - November 2010
SynchLink™ Board for PowerFlex® 700S Drives with Phase II Control
Step 10: Close/Install the
Drive Cover(s)
Close/Install the drive cover(s) in the reverse of removal. Refer to Step 2: Open/
Remove the Drive Cover(s) on page 3.
Step 11: Document the
Change
Document the SynchLink board installation on the “Field Installed Options”
label. Use the blank line if you are installing the SynchLink board in a drive that
was manufactured without it.
FIELD INSTALLED OPTIONS
Firmware #: Date
Firmware
20-HIM
28-IO-
20-COMM-
20B_-DB1-
HIM
I/O
COM Module
Internal Dynamic Brake
#: Date
TIP
Use the packing material from the new SynchLink board to return the
replaced SynchLink board.