Owner manual
26 Rockwell Automation Publication 20D-UM007G-EN-P - March 2012
Chapter 2 Installation and Wiring
Configure Hardware Enable
Ensure that Jumper P22 on the Main Control Board is set to HW Enable
(Pins 2 and 4).
= HW Enable
= No HW Enable
Jumper P22
12
34
12
34
IMPORTANT
In addition to the correct jumper setting, enable circuitry must be
connected to I/O Terminals 13 and 16. For wiring examples, refer to
the following publications.
• PowerFlex 700S Phase II Drive Frames 1…6 Installation
Instructions, publication 20D-IN024
• PowerFlex 700H and 700S Drive Frames 9…14 Installation
Instructions, publication PFLEX-IN006