Owner manual
78 Rockwell Automation Publication 20B-IN026B-EN-P - July 2013
Chapter 4 Converter Assembly Component Replacement Procedures
Install Components
1. Install the new Precharge Board.
2. Torque the Precharge Board mounting screw to 1.8 N•m (16 lb•in).
3. Reconnect all wiring plugs as shown in the figure on the previous page.
4. Replace all safety shields and enclosure covers before applying power to the
drive.