Getting Started with PanelView Plus Manual
46 Rockwell Automation Publication 2080-QS003A-EN-E - September 2014
Chapter 3 Data Values Upload/Download
Download the Project With Project Values
In this section, you will learn how to download the project with the project values to the Micro800 controller.
1. Right-click the controller
project and select Download.
2. If your controller is in Remote
Run mode, a dialog box appears
to ask if you want to change to
Remote Program mode. Click
Yes to con tinu e .
3. A Download Confirmation
dialog box appears. For this
example, select Download with
Project Values.
The Project Values will be
downloaded, but if the variable
also has an Initial Value, it will
take precedence over the Project
Va l u e .
4. A download progress icon
appears.