User manual

Publication 1747-UM011F-EN-P - May 2007
226 Setting Up the DH+ Network
Wiring Connectors for DH+
Communication for SLC 5/04
Processors
To connect Allen-Bradley devices with other devices over DH+, you
must wire the 3-pin cable connectors so that communication can
occur through the cabling. Each device requires its own node address.
Terminate the DH+ link on both ends by connecting a 150 Ω, 1/2 W
resistor between terminals 1 and 2 of the 3-pin connector when you
are communicating at 57.6 Kbaud with a PLC-5 processor or 115.2
Kbaud with other SLC 5/04 processors. Use an 82 Ω, 1/2 W resistor if
you are communicating at 230.4 Kbaud with other SLC 5/04
processors or series E enhanced PLC-5 processor.
SLC 5/04 CPU
PROC
PROG
FORCE
COMM
BATT
RUN
R
E
M
PLC±5/20
PROGRAMMABLE
CONTROLLER
1
2
1
2
AB
SLC 5/04 CPU
1
2
RUN PROG
FORCE
RS232
BATT
DH+
FLT
RUN
REM
RUN PROG
FORCE
RS232
BATT
DH+
FLT
RUN
REM
Clear
Shield
Blue
Clear
Shield
Blue
Clear
Shield
Blue
Terminating
Resistor
Terminating
Resistor
ConnectorConnector Connector
Connector
Belden #9463 Cable
Belden #9463 Cable