User manual
Publication CNET-UM001C-EN-P - November 2005
2 Index
as they affect network update time 5-6
bandwidth limitations 5-6
determining connections 5-3
for non-Logix5000 controllers 5-12
organizing tag data 5-5
controlling I/O over ControlNet 4-1–
4-19, B-7
accessing distributed I/O data 4-13–
4-16
adding distributed I/O to an RSLogix 5000
project
4-11–4-13
controlling 1771 I/O D-1–D-9
requested packet interval 4-2
validating connections 4-17–4-19
ControlNet overview B-1–B-14
D
data types
in produced or consumed tags
5-5
direct connections 4-5–4-6
direct scheduled connections A-1
distributed I/O
accessing data
4-13–4-16
adding to an RSLogix 5000 project 4-11–
4-13
documentation
related to ControlNet
Preface-3
downloading configuration
in RSLogix 5000
3-10–3-11
E
electronic keying
compatible match
3-6
disable keying 3-6
exact match 3-6
setting in RSLogix 5000 3-8, D-3
I
I/O
accessing distributed I/O data in RSLogix
5000
4-13–4-16
adding distibuted I/O to an RSLogix 5000
4-11–4-13
controlling over ControlNet 4-1–4-19
direct connections 4-5–4-6
listen-only connections 4-8–4-9
ownership in a Logix5000 system 4-8–
4-9
rack optimized connections 4-4–4-7
selecting a communication format 4-3–
4-9
validating connections 4-17–4-19
inhibiting the connection to a ControlNet
module
3-5
interlocking controllers
See produced tags or consumed tags
L
listen-only connections 4-8–4-9
listen-only rack optimized
communication format
3-9
M
message instructions 6-1–6-18
caching message connections 6-5
configuring a MSG to a Logix5000
controller
6-8
configuring a MSG to a PLC-5 processor
6-10
configuring a MSG to an SLC 500
processor
6-9
configuring in RSLogix 5000 6-7–6-10
determining connections 6-5
guidelines 6-4
mapping Logix tag names to memory
locations from PLC/SLC data
tables
6-14–6-15
message types
block-transfer read or write
6-5
CIP data table read or write 6-5
CIP generic 6-5
PLC2, PLC3, PLC5 or SLC (all types)
6-5
programming instruction in controller’s
logic
6-6–6-7
receiving MSGs from PLC-5 or SLC 500
processors
6-12
routing PLC-5 messages between
ControlNet networks
6-16–
6-18
staggering messages 6-16
N
network keeper B-8
network update time B-4
as it affects produced and consumed tags
5-6
maintenance portion B-4
scheduled portion B-4