User Manual
Span Your Valves
Chapter 9
9-2
The following table lists command blocks used in this chapter and in
corresponding worksheets from chapters 7 and 8 that contain initial values.
Block: Worksheet:
Clamp Close Profile Block (CPC) 8A
Clamp Open Profile Block (OPC) 8E
First Clamp Close Configuration Block (FCC) 7A
Second Clamp Close Configuration Block (SCC) 7B
Third Clamp Close Configuration Block (TCC) 7C
Clamp Low Pressure Close Configuration Block (LPC) 7D
First Clamp Open Configuration Block (FOC) 7I
Second Clamp Open Configuration Block (SOC) 7J
Third Clamp Open Configuration Block (TOC) 7K
Clamp Open Slow Configuration Block (OSC) 7L
Injection Configuration Block (INC) 7E
Injection Profile Block (IPC) 8B
Pack Configuration Block (PKC) 7F
Hold Configuration Block (HDC) 7G
Pack/Hold Profile Block (HPC) 8C
Plastication Configuration Block (PLC) 7H
Plastication Profile Block (PPC) 8D
ATTENTION: As with any machine start-up, install a test
mold. Programming errors, configuration errors, or hydraulic
problems could lead to machine damage or injury to personnel.
ATTENTION: Make sure all machine guards and shields are in
place before proceeding.
Important: Maintain the same initialization values that you entered in
previous chapters except where noted in the text.
Referenced
W
orksheets