User Manual

Span Your Valves
Chapter 9
9-2
The following table lists command blocks used in this chapter and in
corresponding worksheets from chapters 7 and 8 that contain initial values.
Block: Worksheet:
Clamp Close Profile Block (CPC) 8A
Clamp Open Profile Block (OPC) 8E
First Clamp Close Configuration Block (FCC) 7A
Second Clamp Close Configuration Block (SCC) 7B
Third Clamp Close Configuration Block (TCC) 7C
Clamp Low Pressure Close Configuration Block (LPC) 7D
First Clamp Open Configuration Block (FOC) 7I
Second Clamp Open Configuration Block (SOC) 7J
Third Clamp Open Configuration Block (TOC) 7K
Clamp Open Slow Configuration Block (OSC) 7L
Injection Configuration Block (INC) 7E
Injection Profile Block (IPC) 8B
Pack Configuration Block (PKC) 7F
Hold Configuration Block (HDC) 7G
Pack/Hold Profile Block (HPC) 8C
Plastication Configuration Block (PLC) 7H
Plastication Profile Block (PPC) 8D
ATTENTION: As with any machine start-up, install a test
mold. Programming errors, configuration errors, or hydraulic
problems could lead to machine damage or injury to personnel.
ATTENTION: Make sure all machine guards and shields are in
place before proceeding.
Important: Maintain the same initialization values that you entered in
previous chapters except where noted in the text.
Referenced
W
orksheets