Instruction Manual

Chapter
3
3-1
Constructing a Data Highway or
Data Highway Plus Cable System
Use this chapter to construct a DH and DH+ cable system. It includes how to:
construct a network using 1770-SC station connectors and droplines
construct a network using 1770-XG connector kits and droplines
construct a network using a daisy chain configuration (DH+ only)
reconfigure a network constructed with droplines and station connectors
(if necessary)
Important: Before you begin any procedure explained in this chapter, read
Chapter 2, ‘‘Planning a Data Highway or Data Highway Plus Cable
System” for important specifications, guidelines, and precautions to consider
when installing your cable network.
To: Refer to Page:
Attach an electrical connector to the dropline 32
Test the connector for electrical continuity 37
Test the connector for electrical shorts 37
Install a 1770SC station connector 39
Install a 1770XG connector kit 318
Construct a network using a daisy chain
configuration (DH+ only)
336
Add a node to DH and DH+ 337
Remove a node from DH and DH+ 338
Chapter
Overview