Instruction Manual
1 Publication 1762-UM001G-EN-P - March 2011
Chapter
2
Install Your Controller
This chapter shows you how to install your controller.
Topics include:
• required tools
• agency certifications
• compliance to European Union Directives
• installation considerations
• safety considerations
• power considerations
• preventing excessive heat
• master control relay
• install the memory module and/or real-time clock
• controller mounting dimensions
• controller and expansion I/O spacing
• mount the controller
• mount 1762 expansion I/O
• connect 1762 expansion I/O
Required Tools
You need a screwdriver and a drill.
Agency Certifications
• UL 508
• C-UL under CSA C22.2 no. 142
• Class I, Division 2, Groups A, B, C, D
(UL 1604, C-UL under CSA C22.2 no. 213)
• CE compliant for all applicable directives
• C-Tick compliant for all applicable acts