Manual

67Publication IASIMP-QS008A-EN-P - March 2009 67
Chapter
6
System Validation
Introduction
In this chapter, you validate the DataSite system by verifying that all AGA flow data can be seen
on the PanelView Plus 1000 terminal and on the DataSite web pages.
Before You Begin
Complete your system hardware selection (Chapter 1).
Complete your system layout and wiring (Chapter 2).
Complete the DataSite and Logix Integration (Chapter 3).
Complete the DataSite Workbench and Screen Builder integration (Chapter 4).
Complete the FactoryTalk View integration (Chapter 5).
Verify that all devices are connected properly and are powered up as shown in Connecting
All Devices on page 42.
What You Need
Personal computer
All product hardware from the previous chapters
Software:
DS Flo Config
DataSite Workbench
RSLogix 5000
Java Runtime Environment, Version 6 Update 7
DataSite Accelerator Toolkit CD, publication IASIMP-SP011