Installation and Upgrade Guide Instruction Manual

Publication 1757-IN500A-EN-P - September 2002
Supplementary Procedures 8-27
Installing and connecting Redundant Chassis Pair (RCP)
Hardware
Refer to the following data in Knowledge Builder for general information
about Controller redundancy and how to install and connect the 1757-PLX52,
1757-SRM Redundancy Module (SRM), and 1756-CNBR redundant
ControlNet Bridge module (CNB).
Navigate in Knowledge Builder to Control Builder Components
Theory
Controller Redundancy Functionality before upgrading to a
Redundant Chassis Pair for general information about Controller
redundancy and related terminology.
Navigate in Knowledge Builder to Control Hardware Installation Guide
Controller Module Installation and Removal for information on installing
the 1757-PLX52 module.
Navigate in Knowledge Builder to Control Hardware Installation Guide
Redundancy Module Installation and Removal for information on installing
the 1757-SRM module.
Navigate in Knowledge Builder to Control Hardware Installation Guide
ControlNet Communication Module Installation and Removal for
information on installing the 1756-CNB module.
Updating Firmware Revision Levels
Refer to Upgrading Hardware Component Firmware on page 7-4 to
check/upgrade 1757-PLX52, 1756-CNB, and 1757-SRM firmware.
Creating a Redundant 1757-PLX52
1. Create redundant CPMs
Navigate in Knowledge Builder to Control Building GuideHardware
Module Creation
Creating a Control Processor Module for more information
about configuring a redundant 1757-PLX52 in Control Builder.
IMPORTANT
Stop! It is essential that you check the firmware revision
levels for ALL ProcessLogix hardware components after a
ProcessLogix software installation.
Do not proceed until you have upgraded the firmware.