Installation and Upgrade Guide Instruction Manual

Publication 1757-IN500A-EN-P - September 2002
Additional Redundant Server Procedures 6-21
Depending on your configuration, this may take some time to complete.
7. Wait for the synchronization to complete (“Synchronization Complete”
prompt appears) and verify that the display shows simulated Green
LED indications for the following states:
Primary Server
Running
Backup Server
Synchronized
Running
Link Status
Link 0 (LNK00) - OK Active link
Link 1 (LNK01) - OK (Only applies if you are using a dual LAN)
8. Click Station Exit.
9. Click Yes to exit Station.
Confirming Databases are Synchronized
1. On SERVERA, click Start Run.
2. Enter this command:
>cmd<
and click OK to open the DOS window.
3. At the DOS prompt, key in this command:
>dual_status<
and press <Enter>.