User guide
Publication 1738-IN019A-EN-E - June 2004
ArmorPoint I/O Field Potential Distributor, Series A 5
Install the mounting base as follows:
1. Lay out the required points as shown above in the drilling
dimension drawing.
2. Drill the necessary holes for #8 (M4) machine or self-tapping
screws.
3. Mount the base using #8 (M4) screws.
4. Ground the system using the ground lug connection. (The
ground lug connection is also a mounting hole.)
Grounding lug connection
Latching mechanism
Keyswitch -
Set to position
8 for the
1738-FPD
Mounting base
43675