Installation Instructions Owner manual

11 POINT I/O PROFIBUS Adapter
Publication 1734-IN014C-EN-P - March 2002
Indication Probable Cause
Adapter Status
Off No power supplied.
Hardware check in progress.
Initialization in progress.
Green Operating normally
Red Hardware check fault.
PROFIBUS Status
Off No power supplied.
Bus is off-line.
Green Bus is online (data exchange).
Flashing Green Adapter has received a CLEAR command from the master.
Red Error in PROFIBUS initialization.
No modules installed in the backplane.
Flashing Red 1Hz - Check_Configuration telegram rejected.
- Maximum number of POINT I/O modules in master
configuration overridden.
2Hz - SetPrm telegram rejected.
- The first byte in user parameter data does not equal zero.
- Maximum number of user parameter bytes overridden.
PointBus Status
Off No power supplied.
Hardware check in progress.
Initialization in progress.
Green Normal operation.
Flashing Red 1Hz -
Incorrect POINT I/O module installed.
POINT I/O module removed from backplane.
Red Critical link failure (BUS_OFF).