User Manual, 800 Amp - 208V Owner's manual
12 Rockwell Automation Publication 1608M-UM003A-EN-P - December 2013
Chapter 2 Installation
Figure 4 - MegaDySC Cabinet Preparation for SBS Layout
Figure 5 - ER Storage Cabinet Preparation for SBS Layout
Preparing the ER System for BTB layout
1. Remove all tan-colored masking dots, blue-colored tape, and all plastic
sheets.
2. Remove all eight (8) plastic 13 mm hole plugs in the right side of the
switchboard cabinet.
Remove these two (2)
75mm” Dia. EKO’s
Remove plugs from
these two (2) locations
Do not remove
these two (2) plugs
Remove these two
(2)63mm Dia. EKO’s
Remove and SAVE
3/8-16 hardware from
two (2) locations