User guide
5-22 Maintenance
1512A-UM102B-EN-P – June 2013
Figure 5.19 – Defeater Pin
If it is possible to move the isolation switch handle to the OFF position
for reassembly, follow steps 5-10.
If it is not possible to move the isolation switch handle to the OFF posi-
tion for reassembly, follow steps 11-13.
The Z-clip assembly must be reassembled to ensure
the interlocking mechanism functions properly.
Failure to do so will let personnel access live
medium voltage parts and may cause severe burns,
injury or death.
Emergency Circumventive
Procedure for Power Cell
Entry (cont.)
A T T E N T I O NA T T E N T I O N