User guide

2-14 Installation Standard Enclosure
151 2A -U M1 02B-EN-P June 2013
Roof P lan
Front
Route cables through
access hole
CurrentTransformer
Figure 2.14 Routing of Load Cables (Top exit shown)
A T T E N T I O NA T T E N T I O N
Ensure all barriers are replaced before re-
energizing the equipment. Failure to do so may
result in electrical faults and cause damage to
equipment or serious injury to personnel.
Figure 2.15 Load Cable Conduit Openings, Top Exit