User Manual

Installation
Overview This chapter describes the procedures for the installation of the GE Multilin to
Bulletin 825 Plus Conversion Kit within a medium voltage controller.
Installation within other controller types can also be accomplished by following
the principal philosophy of the retrot described.
This manual is intended for use by personnel trained and
familiar with medium voltage, solid-state power equipment,
and general industrial controls.
Pre-Installation To avoid shock hazards, lock out incoming power before
working on the equipment. Verify with a hot stick or appro-
priate voltage measuring device that all circuits are voltage
free. Failure to do so may result in severe burns, injury or
death.
The National Electrical Code (NEC) and/or Canadian Elec-
trical Code (CEC) or other local codes outline provisions
for safely installing electrical equipment Failure to follow
locally applicable codes can result in hazards to personnel
or a non-compliant installation.
Tools required:
Sheet metal cutting tools capable of cutting up to 12 gauge material
Hand drill, and drill bits
Screw drivers / Nut drivers
Drop sheets or tarp
Socket wrench with 3/8 socket
Marking device
Needle nose pliers
Wire cutters
Chapter 4
1500-IN059C-EN-E – June 2013
Figure 4.1 – Tools Required
ATTENTION
ATTENTION
IMPORTAN T
ATTENTION