Installation Instructions (30A, 60A, 100A) Owner manual

PN-224754
DIR 10001182729 (Version 01)
Handle and Cable Mechanism Installation
1
Cable Operated Switch Installation
1 Install gasket. 2 Connect handle link to lever pin. 3 Install hitch pin through handle link.
TIP: Move handle to
“ON” position to help
connect handle link
to lever pin. Return
handle to “OFF”
position once
connected.
4 Verify handle is in “OFF” position.
5 Install handle nuts.
6 Install spring to handle link.
30 - 40 lb-in
8 Install defeater lever.
7 - 11 lb-in
Defeater
Lever
7 Install other end of spring to cable mechanism bracket
using needlenose pliers.
6
7
(5)