4-4 Unpacking, Inspecting and Storing
Drive Checkout Test
This test sequentially verifies that:
Drive power wiring is correct and start-up logic is functioning
The drive and motor are correctly wired
Drive serial communications are operational
Before beginning “Initial Power-up”, please check the following:
All wiring and mounting to verify correct installation
Input voltages to ensure they do not exceed specifications for the
drive or motor.
Figure 4.1 Connection Diagram
Intro
J4
DRIVE
J1
TB1
TB1
26 +24V
20 ENABLE
21 FAULT RESET
2 RCV
3 XMT
5 COM
Phase R 1
Phase S 2
Phase T 3
Motor Gnd 4
L1 7
L2/N 8
Gnd 9/10
100-240 VAC
50/60 Hz
Single Phase
XMT
RCV
COM
Close to ENABLE drive
Close to RESET faults
Power Source
TB1
L1 7
L2/N 8
Gnd 10
L3 9
or
J2
Motor
Encoder
100-240 VAC
50/60 Hz
Three Phase
Power Source
Gnd = Pin 9 for DDM-010, DDM-020, DDM-030
Gnd = Pin 10 for DDM-075 using single phase
!
Intro
ATTENTION: Be prepared to disable the drive or remove
input power if excessive motor motion occurs while per-
forming the following steps.