User guide

1397 Open Chassis Dynamic Brake 13
1397-5.15 March, 1999
181/L1
81
47 (+)
45 (–)
M
M
A1
M
ARMATURE
SUPPLY
1397 DRIVE
1397 DRIVE
DB RESISTORS
IFP Kit
282
281
283
AC
INPUT
82
83
182/L2
182/L3
A1
A2
S2
S1
MOTOR ARMATURE
2
1
6
7
5
DBR
A2/S1
8
8
1FU
2FU
3FU
3
2
4
F1
F2
1
P6-5
P6-2
RRB1-5RRB1-6
35-F237-F1
DBCR
13
FROM
FIELD
SUPPLY
14
M AUX
DYNAMIC BRAKE
TERMINAL BLOCK
MOTOR SHUNT FIELD
10
9
S2
DRV
MOT
2
A1
S2
DBR
A2/S1
4
3
MOTOR SERIES FIELD
For 1397-DB-B400L — B600L Kits
If You are Using DB with a Motor Series Field
S1 connected to A2/S1—with an Inverting Fault CIrcuit Breaker . . .
Remove and lockout all power to the drive and follow the wiring diagram above.
Follow the wiring diagram above to connect the motor armature to the drive and Inverting Fault Circuit Breaker.
Remove the connector bar link at A2/S1, but retain the A2/S1 connection bar and all (4) mounting bolts.
Replace the (2) lower bar bolts removed previously. Torque to 23.00 N-m (200 lb.-in.).
Replace the upper A2/S1 terminal bar using the (2) upper bar bolts removed previously. Torque to 23.00 N-m
(200 lb.-in.).
Connect the Inverting Fault Circuit Breaker kit to the DRV and MOT terminals as shown. Refer to the Inverting
Fault Circuit Breaker Installation Instructions for additional information.
Route and connect the A2 motor cable to drive connection bar A2/S1.
Route customer supplied cable between A2/S1 and motor connection S1. Cable should be sized to the same
guage as the DB resistor cables.
Route the DB resistor cables through the grommeted hole in the resistor mounting panel. Connect to connection
bars DBR
& A2/S1 at the top of the 1397 drive using the (2) M10 hex bolts, washers and KEP nuts supplied
with the kit. Torque to 23.00 N-m (200 lb.-in.).
Connect the motor series field between S1 & S2.
Verify that the jumper between terminals 3 & 4 at the drive terminal block is installed.
Remove the lockout and reapply power. Refer to 1397-DB-B400L—B600L Dynamic Brake Kit
Operation above and proceed to Setup on the last page.