Owner's manual

2-2 Step 2 - Plan the Installation
1329I-5.5 Integrated Drive/Motor — January, 2000
Planning the installation is necessary to ensure you have acceptable environmental and
operating conditions for the unit. Read and follow the requirements given below before
proceeding with the installation:
Locate the unit where it will have unrestricted clearance as shown in Figure 2.2.
Locate the unit where it will be kept clean (away from oil, coolants, or airborne
contaminants). The 1329I unit has an IP54/NEMA Type 12 rating. An IP rating
designates the enclosure’s level of protection. The first number in the rating (5)
indicates that the 1329I unit is dust-resistant. The second number (4) indicates that
the unit is splashproof.
Mount the unit on a flat surface.
Verify that the ambient temperature will remain between 0
˚C to 40˚C (32˚F to
104
˚F).
Verify that the relative humidity will be between 5 percent and 95 percent,
non-condensing.
For installations above 1000 meters (3300 feet), refer to Appendix A for derating
guidelines.
Verify that there will be adequate clearance for opening the cover. See Figure 2.2.
Verify that there will be adequate clearance for blower intake. See Figure 2.2.
Figure 2.2
Access Clearances
RESET
10.25 in
1.3 in
1 in
3 in
Cover Clearance
Blower Intake
Clearance
Front View
Top View