F. If the SLS switch is moved back to the ON position the following will
happen:
1. The SLS switch contac ts between the safety relay terminals S10 and
S11, and S21 and B2 will close to energize the safe ty relay. This
causes the safety contacts between terminals #13 and #14 between
wir es #1 a nd #3 to close.
Note: The SLS switch contacts must close at approximately the same
time or the safety relay will lock up. This may denote an SLS switch
or cable failure. Also, the contacts IC and 1CR between terminals S41
and S42 must be closed or the safety relay will not energize. This may
indicate a failure of IC, 1CR, the SLS switch or the cable. Plus, safety
relay auxiliary contacts between terminals #33 and #34, and #43 and
#44 will close energizing 1CR.
2. Since 1SR between wires #4 and #5 is closed along with 1CR
between wires #3 and #4, and the safety relay SR output contacts
be twee n terminals #13 and #14 are also closed, IC will close its
output po wer contac ts .
3. The PVSR will detect a voltage and see that the circuit between
terminals Y4 and Y5 is open, causing the safety contacts between
ter minals #13 and #1 4 PVS R to open.
4. All contacts in series with the SAFE light should now be open and
the SAFE light will now be of f. The TB led between
wire #12 an d – will be off.