Product Manual

Accu-Chek Performa Operator Training © VIHA 2013
When to do Quality Control
A Quality Control should be done:
Immediately prior to client testing if not done within the last 24 h
Upon opening a new vial of test strips or control solutions
If meter dropped
If there is a question about a clients glucose results – e.g. glucose
result is inconsistent with clinical presentation
Minimally - ONCE per week.
19