Technical data

Installation, user and maintenance manual – GAHP-A
61
During the rst start-up procedure it is in any case necessary to:
check the dynamic gas mains pressure•
check and adjust the appliances combustion parameters•
You will need: the appliance connected to the gas and electricity supply: switched o
and with the gas cock closed; front panel removed.
Check the dynamic gas mains pressure
Connect the manometer to the gas intake (see detail D, Figure 6.1 Gas 1.
valve 61).
Open the gas cock and check that the static mains pressure is in line with the val-2.
ues given in Table 6.1 Network gas pressure 61.
If the static mains pressure is greater than 50 mbar DO NOT switch on the
appliance!
Give the consent signal for operation.3.
After a few seconds of operation, check that the dynamic mains pressure is in line 4.
with the values given in Table 6.1 Network gas pressure 61.
Figure 6.1 – Gas valve
Gas valve Honeywell VK 4115V
LEGEND
A Plug
B
Key Torx TX40
C screw adjustment CO2
D gas pressure intake
Table 6.1 – Network gas pressure
E3-GS; E3-WS; E3-A; GAHP-GS; GAHP-WS; GAHP-A Gas supply pressure
Product categories Countries of destination G20 [mbar] G25 [mbar] G30 [mbar] G31 [mbar] G25.1 [mbar] G27 [mbar] G2,350 [mbar]
II
2H3B/P
AL, BG, CY, CZ, DK, EE, FI, GR,
HR, IT, LT, MK, NO, RO, SE,
SI, SK, TR
20 30 30
AT, CH 20 50 50
II
2H3P
AL, BG, CZ, ES, GB, HR, IE, IT,
LT, MK, PT, SI, SK, TR
20 37
RO 20 30