5 FIRST SWITCH ON
First Start-Up entails checking/setting up the combus-
tion parameters and may exclusively be carried out by a
Robur TAC. NEITHER the user NOR the installation tech-
nician is authorised to perform such operations, under
penalty of voiding the warranty.
5.1 PRELIMINARY CHECKS
Preliminary checks for First Switch-on
Upon completing installation, before contacting the TAC the in-
staller is bound to check:
water-heating, electrical and gas systems suitable for the re-
quired capacities and equipped with all safety and control
devices required by the regulations in force;
absence of leaks in the water and gas systems;
type of gas for which the appliance is designed (methane
or LPG);
supply gas pressure complying with the values of Table
3.3p.22, with max tolerance ±15%;
Power supply mains complying with the appliance's rating
plate data;
appliance correctly installed, according to the manufactur-
er's instructions;
system installed in a workmanlike manner, according to na-
tional and local regulations.
Abnormal or hazardous installation situations
Should any abnormal or hazardous installation situations be
found, the TAC shall not perform First Switch-on and the appli-
ance shall not be commissioned.
These situations may be:
appliance installed inside a room;
failed compliance with minimum clearances;
insucient distance from combustible or ammable mate-
rials;
conditions that do not warrant access and maintenance in
safety;
appliance switched on/o with the main switch, instead of
the control device provided (DDC, or external enable);
appliance defects or faults caused during transport or instal-
lation;
gas smell;
non-compliant mains gas pressure;
all situations that may involve operation abnormalities or are
potentially hazardous.
Non-compliant system and corrective actions
Should the TAC nd any non conformities, the user/installer is
bound to perform any corrective procedures required by the
TAC.
After performing the remedial actions (the installer's responsi-
bility), if the TAC deems that safety and conformity conditions
are in place, "First Switch-on" may be eected.
LEGEND
KP Relay on the unit for recovery exchanger
pump request
KPt Thermostat with set-point calibration of
DHW tank (not supplied)
KPs Thermostat calibrated at 35 °C with
capillary tube in the lower part of the
DHW tank (not supplied) [to be provided
in the event the water ow rate on the
recovery circuit exceeds the nominal
value of 1000 l/h]
KPc Two-pole relay for recovery exchanger
pump request (not supplied)