Technical data
Installation, user and maintenance manual – Series B15 Generators
15
Figure 3.2
Clearances: minimum clearance required for installation.
350
Min 2,5 m
Max 3,5 m
Min 200 A A
Min 400
2,2 ÷ 3,0 [m]
(min/max)
300
Figure 3.3
Example of generator positioning.
3.2 SIZING AND INSTALLING THE COMBUSTION AIR/FUMES EXHAUST
TUBES
Series B15 hot air generators can be installed in one of the following ways.