User Manual

26
STEP6. Connect ID03 and ID02 with “Knee Frame by using Bolt (B35) and Nut. Then, rotate the W Cable
3~4 times and put into empty space.
STEP7. Connect ID01 and ‘Uframe by using Bolt (B27). Then use the 2s rivet to fix with Joint Frame”.
NUT
Be careful JOINT frame direction