Specifications

Fan Blower Controls
Fan Blower • Off Delay on Break
APPLICATIONS TIMING DIAGRAM
”OFF delay on break”
Controls the circulating fan in heat pump, air conditioning and forced air systems. OFF delay timing function continues
to run the fan at the end of the heating/cooling cycle, thereby purging ducts of residual air and increasing system
efficiency.
MODE OF OPERATION
Power must be applied before and during the time delay period. When the initiate contact closes, the load energizes
and remains energized as long as the initiate contact is closed. The time delay begins when the initiate contact opens.
At the end of the time delay period, the load is turned off. If the initiate contact recloses during the time delay period
the load remains energized and the time delay is reset to zero. Removal of input power during the delay turns off the
load and resets the time delay to zero. A one-second interrogation delay is provided to avoid nuisance trips due to
thermostat bounce or tampering.
Fan Blower • Dual On/Off
APPLICATIONS TIMING DIAGRAM
”ON delay on make” and ”OFF delay on break”
Controls the circulating fan in heat pump, air conditioning and forced air systems. Delay on make lets air reach proper
level prior to turning on the fan. OFF delay timing function continues to run the fan at the end of the heating/cooling
cycle, thereby purging ducts of residual air and increasing system efficiency.
Time
Delay
Delay
on Make
Delay on
Break Per od
Initiate Switch
Closed
Initiate Sw tch
Open
0
V
Input
Voltage
0
V
Load
Voltage
Time
Time
Time
Delay
Load Energized
MODE OF OPERATION
Power must be applied before and during the time delay period. When the initiate contact closes, the delay on make
period begins. The load then energizes and remains energized as long as the initiate contact is closed. The delay on
break period begins when the initiate contact opens. At the end of the time delay, the load is turned off. If the initiate
contact recloses during the time delay, the load remains energized and the time delay is reset to zero. Removal of
input power during the delay turns off the load and resets the time delay to zero.
OFF Delay Timing Purges Residual Air
ICM Control Features and Applications Specifications Replaces
ICM253
UL 873 recognition for compressor applications
Post-purge fan delay timer
OFF delay purges ducts of residual air at the end of the heating/cooling cycle
Interrogation delay eliminates nuisance trips due to thermostat bounce/tampering
Voltage: 18-30 VAC
• 1 amp maximum
• 40 mA minimum
• 10 amp inrush
Adjustable time delay:
• 12-390 seconds
Dimensions: 2” x 3”
Field Controls:
46144700
Gemline: 1C216
Mars: 32393
ICM Control Features and Applications Specifications Replaces
ICM251
Drives fan directly
High power, relay output
Dual function fan delay timer
Controls the circulating fan in heat pump, A/C and forced air systems
OFF delay controls fan relay to purge ducts of residual air at the end of the
heating/cooling cycle
ON delay allows air to reach the proper comfort level prior to energizing the fan
115 and 230 VAC are also available, please consult factory
Voltage: 18-30 VAC
Output:
N.O.: 20 amps @ 240 VAC
N.C.: 10 amps @ 240 VAC
Time delays adjustable:
ON: 1-180 seconds
OFF: 12-390 seconds
Dimensions: 2” x 3”
Mars:
32377
32378
32379
ICM254
Dual function fan delay timer
Controls the circulating fan in heat pump, A/C and forced air systems
OFF delay controls fan relay to purge ducts of residual air at the end of the
heating/cooling cycle
ON delay allows air to reach the proper comfort level prior to energizing the fan
Voltage: 18-30 VAC
• 1 amp maximum
• 40 mA minimum
• 10 amp inrush
Time delays adjustable:
ON: 1-180 seconds
OFF: 12-390 seconds
Dimensions: 2” x 3”
Honeywell:
S876A1016
Watsco:
PSTD-000-005W
PSTD-000-060W
ICM255
Low cost open board design
High power, relay output
Dual function fan delay timer
Controls the circulating fan in heat pump, A/C and forced air systems
OFF delay purges ducts of residual air
ON delay allows air to reach the proper comfort level prior to energizing the fan
Voltage: 18-30 VAC
N.O.: 20 amps @ 240 VAC
N.C.: 20 amps @ 240 VAC
Time delays fixed:
ON: 1 second
OFF: 60 seconds
Dimensions: 2.5” x 2.5”
A-1: 5893
Bard: 8201-056
Mars: 32574
Rheem:
42-22515-01
42-22515-02
42-22515-03
Snyder General/
ICP: 1395336
315.233.5266
Phone
All features and specifications subject to change without notice.
Customer Service Fax
315.233.5282
Application Assistance
800.365.5525
Visit www.icmcontrols.com to find all
of our latest products, sell sheets and wiring diagrams
24